翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Boeing 727-223 : ウィキペディア英語版
Boeing 727


The Boeing 727 is a mid-size narrow-body three-engine jet aircraft built by Boeing Commercial Airplanes from the early 1960s to 1984.〔 It can carry 149 to 189 passengers and later models can fly up to nonstop. Intended for short and medium-length flights, the 727 can use fairly short runways at smaller airports. It has three Pratt & Whitney JT8D engines below the T-tail, one on each side of the rear fuselage with a center engine that connects through an S-duct to an inlet at the base of the fin. The 727 is Boeing's only tri-jet aircraft.
The 727 followed the 707, a quad-jet airliner, with which it shares its upper fuselage cross-section and cockpit design. The 727-100 first flew in February 1963 and entered service with Eastern Air Lines in February 1964; the stretched 727-200 flew in July 1967 and entered service with Northeast Airlines that December. The 727 became a mainstay of airlines' domestic route networks and was also used on short- and medium-range international routes. Passenger, freighter, and convertible versions of the 727 were built.
The 727 was heavily produced into the 1970s; the last 727 was completed in 1984. , a total of 109 Boeing 727s (5× 727-100s and 104× -200s) were in commercial service with 34 airlines.〔"2013 World Airliner Census", p. 49.〕 Airport noise regulations have led to 727s being equipped with hush kits.
==Development==
The Boeing 727 design was a compromise among United Airlines, American Airlines, and Eastern Air Lines requirements for a jet airliner to serve smaller cities with shorter runways and fewer passengers. United Airlines wanted a four-engine aircraft for its flights to high-altitude airports, especially its hub at Stapleton International Airport at Denver, Colorado.〔 American, which was operating the four-engine Boeing 707 and Boeing 720, wanted a twin-engine aircraft for efficiency. Eastern wanted a third engine for its overwater flights to the Caribbean, since at that time twin-engine commercial flights were limited by regulations to routes with 60-minute maximum flying time to an airport (see ETOPS/LROPS). Eventually the airlines agreed on a trijet.〔
In 1959 Lord Douglas, chairman of British European Airways (BEA), suggested that Boeing and de Havilland Aircraft Company (later Hawker Siddeley) work together on their trijet designs, the 727 and D.H.121 Trident, respectively.〔Connors, p. 355.〕 The two designs had a similar layout, the 727 being slightly larger. At that time Boeing intended to use three Allison AR963 turbofan engines, license-built versions of the Rolls-Royce RB163 Spey used by the Trident.〔(【引用サイトリンク】title=1960 - 2990 - Flight Archive )〕〔(【引用サイトリンク】title=boeing - trident - 1960 - 3096 - Flight Archive )〕 Boeing and de Havilland each sent engineers to the other company's locations to evaluate each other's designs, but Boeing eventually decided against the joint venture.〔Connors, p. 357.〕 De Havilland had wanted Boeing to license-build the D.H.121, while Boeing felt that the aircraft needed to be designed for the American market, with six-abreast seating and the ability to use runways as short as 4,500 ft.
In 1960 Pratt & Whitney was looking for a customer for its new JT8D turbofan design study, based on its J52 (JT8A) turbojet,〔Connors, pp. 348–349.〕 while United and Eastern were interested in a Pratt & Whitney alternative to the RB163 Spey.〔Connors, p. 350.〕 Once Pratt & Whitney agreed to go ahead with development of the JT8D, Eddie Rickenbacker, Chairman of the Board of Eastern, told Boeing that the airline preferred the JT8D for its 727s. Boeing had not offered the JT8D as it was about 1,000 lbs heavier than the RB163, though slightly more powerful; the RB163 was also further along in development than the JT8D. Boeing reluctantly agreed to offer the JT8D as an option on the 727 and it later became the sole powerplant.〔Connors, p. 352.〕
With high-lift devices〔Eden, Paul. (Ed). ''Civil Aircraft Today.'' 2008: Amber Books, pp. 72–3.〕 on its wing the 727 could use shorter runways than most earlier jets (e.g. the 4800-ft runway at Key West).
Later 727 models were stretched to carry more passengers〔Eden 2008, pp. 74–5.〕 and replaced earlier jet airliners such as the Boeing 707 and Douglas DC-8 as well as aging prop airliners such as the DC-4, DC-6, DC-7 and the Lockheed Constellations on domestic routes.
For over a decade more 727s were built per year than any other jet airliner; in 1984 production ended with 1,832 built〔 with 1,831 delivered, the highest total for any jet airliner until the 737 surpassed it in the early 1990s.〔Norris and Wagner. ''Modern Boeing Jetliners'', pp. 12–3. Motorbooks International, 1999.〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Boeing 727」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.